DATE:
SUBJECT: Bi-weekly report for Ray Hartstein Campus Art, Science and Technology Pavilion
This month action:

·
The temporary smoke doors on the second floor of the
North wing have been installed.
·
The wood doors for the multipurpose room have been
installed.
·
The video and sound system for the multipurpose room has
been installed.
·
The existing East wing building has been fully abated.
·
The existing East wing building 1st and 2nd
floor has been cleaned out.
·
The water and power have been shutoff in the old high
school building.
·
The building will start being dismantle on